Saturday, October 26, 2013

October 2013: Trim; paint; electrical; baseboards & moulding go up; bathroom tile and granite

I missed just a few days of photo chronicling (yes; I looked it up in the dictionary), and look what happens!  More transformation!


Dave put the first coat of paint on the walls, and the RB Flooring folks put a coat of finish on the floor.

The pretty niche-room floor designed by Fermin Rodriguez.

Dave working in his outdoor shop!






Dave labeled the wires!


Baseboard and moulding.


Tile, and the granite on the shower bench and niche!






September 2013: Starting the trim; bathroom taking shape; flooring; and food!

Lots more in September!  Dave set up an outdoor shop to paint and sand the doors, crown moulding, and baseboard.  The master bathroom is starting to come together.  The Rodriguez Brothers Flooring guys put in a beautiful floor.  Fermin Rodriguez thought up the cool design in the niche room; thanks, Fermin!  We love it!

Once in awhile we get really excited about dinner and take a couple of pictures, so we put these in here too.  Dave makes awesome sauces for our chicken!