Saturday, August 24, 2013
June 2013: Foundation, Plumbing, Flooring, and more
June was The Month of Pouring the Foundation, New Plumbing, and Setting Up the Floor (boards, insulation, plywood)™.
It's funny to see the red umbrella in a couple of pictures from this month and May, because for some reason it self-destructed in July -- turned white and totally fell apart. We laughed at it for awhile, but then it just looked too gross, so we finally threw it out.
It's funny to see the red umbrella in a couple of pictures from this month and May, because for some reason it self-destructed in July -- turned white and totally fell apart. We laughed at it for awhile, but then it just looked too gross, so we finally threw it out.
May 2013: Getting rid of old plumbing, and some foundation work
In May, Dave, with help from his brother Ed, pulled out old excess plumbing and had a good-sized area to work in so they could install new piping.
The crazy contraption in some of these pictures is a concrete cutter. Someone at the county Building Department insisted that our foundation depth in back was 4 inches and needed to be 8. It was 8, but Dave couldn't convince the lady behind the desk (Dave: "It's 8 inches." Lady "No, it isn't." Dave: "But it is." Lady: "No, it isn't."). Our gummint at work.
So Dave had to cut out the 8 inches of foundation, prep the hole... and pour in another 8 inches of concrete.
Et voilà:
The crazy contraption in some of these pictures is a concrete cutter. Someone at the county Building Department insisted that our foundation depth in back was 4 inches and needed to be 8. It was 8, but Dave couldn't convince the lady behind the desk (Dave: "It's 8 inches." Lady "No, it isn't." Dave: "But it is." Lady: "No, it isn't."). Our gummint at work.
So Dave had to cut out the 8 inches of foundation, prep the hole... and pour in another 8 inches of concrete.
Et voilà: