In May, Dave, with help from his brother Ed, pulled out old excess plumbing and had a good-sized area to work in so they could install new piping.
The crazy contraption in some of these pictures is a concrete cutter. Someone at the county Building Department insisted that our foundation depth in back was 4 inches and needed to be 8. It was 8, but Dave couldn't convince the lady behind the desk (Dave: "It's 8 inches." Lady "No, it isn't." Dave: "But it is." Lady: "No, it isn't."). Our gummint at work.
So Dave had to cut out the 8 inches of foundation, prep the hole... and pour in another 8 inches of concrete.
Et voilĂ :
No comments:
Post a Comment